The
Chhattisgarh govt has proposed a 'tribal tourism circuit' for Chattisgarh
development and expansion of tourism facilities in tribal areas of
Chhattisgarh. The plans have been made for the development of Chhattisgarh’s
tribal tourism circuit under ‘Swadesh Darshan’ scheme. For improving the state
art and culture, the transportation is the most important factor which makes
the state strong.

Chhattisgarh
has developed a tribal tourism circuit to ensure development of tourism
facilities in remote tribal areas of the state.
Jashpur-Sanna-Tatapaani-Mainpat-Chaturgarh-Kurdar-Kabir Chabutra-Sarondha
Dadar-Kanker-Kondagaon-Jagdalpur- Chitrakot and Dantewada were included under
the circuit. The Centre has Union has proposed the development of these circuits
on a special theme under the ‘Swadesh Darshan’ scheme to attract domestic and
foreign tourists.
The state of
Chhattisgarh is naturally rich state with a lot of resources available. It is
the largest producer of fine products of steel, iron , aluminium etc. So the
transportation facilities of the state need to be improved a lot. The Centre
government has accorded ‘in-principle’ approval for the most significant road
project of Chhattisgarh, Raipur-Bilaspur National Highway. It was proposed to
be the fast scheme which will improve the transportation facilities in the
whole state. There was an instruction by the NHAI officials to complete tender
and other necessary procedures as early as possible.
Raipur-Bilaspur
National Highway No. 30 and 130 is the most significant road for the state as
it connects the capital city, Raipur to Bilaspur High Court. The traffic count
on the 126.525 km-long highway was 25649 PCU (Passenger car unit) as per traffic
census of year 2014. This project is important for the state in terms of
finance as many industrial areas are located on both sides of the highway. More often the judges often use this
road as airport and High court were in two different cities. He said the
Raipur-Bilaspur National Highway project will have six-lane roads from Raipur
to Simga and four-lane roads from Simga to Bilaspur. The main purpose behind the construction of
these schemes was for the uninterrupted transport services in state. There needs
to be taken strict action for the fulfillment of these minor requirements.

A proposal for building a training and
research institute at Tendua village was made. For the success implementation
of the construction, the necessary requirements were made. These institutes
will be too beneficial for all the people of Chhattisgarh. All these small
improvements will lead to Chhattisgarh development.
